加勒比hezyo一本道无码av|中文字幕无码亚洲日韩|久久久久久国产精品无码APP|91精品国产色综合久久不8|

The Foundation 3

Date: 2019.06.17

Jiangsu Datang Binhai Offshore Wind Farm Project contains 50 MySE3.0-135 wind turbines in construction. This wind farm mainly contains the mealy sand and silty clay, the monopile foundation is finally chosen for the purpose achieve cost optimization that depend on the seabed elevation of -17.5m~ -22m. There are almost 25 wind turbines have been installed until June 15th, 2019.