加勒比hezyo一本道无码av|中文字幕无码亚洲日韩|久久久久久国产精品无码APP|91精品国产色综合久久不8|

MySE5.5-155

Date: 2018.12.14

The two MySE5.5-155 wind turbines are located at the positions of Y8 and Y9 in Xinghuawan Bay Wind Farm. The monthly generation of November of Y8 is around 2,400MWh.Moreover, the total generation after grid-on half year ago is around 11210MWh,while the equivalent generation hours of above-rated operation is 2040 hours, superior to those of all other wind turbines integrated into the grid simultaneously. The wind turbine at the position of Y9 has performed almost the same result as Y8 since it was integrated into the grid three months ago, which demonstrates the robustness, efficiency and reliability of MySE5.5-155 wind turbines.

林西县| 卢龙县| 云林县| 南川市| 栾城县| 磐石市| 缙云县| 丽水市| 卓尼县| 若尔盖县| 论坛| 大新县| 轮台县| 茶陵县| 饶阳县| 大关县| 固原市| 浦城县| 夹江县| 运城市| 青浦区| 奇台县| 佛山市| 余庆县| 广东省| 娄底市| 象州县| 黄浦区| 龙南县| 黑河市| 普陀区| 嘉义县| 玉树县| 来宾市| 汾西县| 盖州市| 巴楚县| 临颍县| 个旧市| 静乐县| 宁夏|