加勒比hezyo一本道无码av|中文字幕无码亚洲日韩|久久久久久国产精品无码APP|91精品国产色综合久久不8|

The Foundation 3

Date: 2019.05.22

Wailuo Offshore Wind Power Project, located in Zhanjiang, Guangdong province,is plannaed to be equipped with 36 sets of MySE5.5-155 wind turbines with a total capacity of 198MW. The windfarm has the medium-weathered rock stratum with sandy soil and clay geology, the monopile foundation is finally chosen for the purpose achieve cost optimization that depend on the diameter of 6.5-7m which is applicable within water depth of 19m through the multiple round of iterative computations jointly carried out by the design institute and MingYang.The construction of the first monopile foundation is completed before June 30, 2018.