加勒比hezyo一本道无码av|中文字幕无码亚洲日韩|久久久久久国产精品无码APP|91精品国产色综合久久不8|

MySE5.5-155

Date: 2024.02.23

The two MySE5.5-155 wind turbines are located at the positions of Y8 and Y9 in Xinghuawan Bay Wind Farm. The monthly generation of November of Y8 is around 2,400MWh.Moreover, the total generation after grid-on half year ago is around 11210MWh,while the equivalent generation hours of above-rated operation is 2040 hours, superior to those of all other wind turbines integrated into the grid simultaneously. The wind turbine at the position of Y9 has performed almost the same result as Y8 since it was integrated into the grid three months ago, which demonstrates the robustness, efficiency and reliability of MySE5.5-155 wind turbines.

安塞县| 澜沧| 江城| 长宁区| 南投县| 岚皋县| 手游| 大姚县| 寻甸| 金堂县| 耒阳市| 宁津县| 铜鼓县| 淮南市| 交口县| 绥化市| 酒泉市| 凤山县| 峨山| 乌拉特后旗| 溆浦县| 汉中市| 新绛县| 延津县| 岳西县| 安徽省| 平乐县| 新乡市| 西丰县| 江华| 礼泉县| 尉犁县| 香港| 汾阳市| 天气| 彝良县| 甘肃省| 客服| 南岸区| 龙里县| 铁岭县|